Originally asked by Jose Lobo on 16 July 2021 (original question)
Is it possible to move/sync Test Lab execution status from ALM to JIRA?
I was looking for test status sync from ALM to JIRA via Exalate to reduce doing Testing Status reports manually.
Does Exalate have the option to do so?