# Feature Request: Better control over which Jira spaces show Exalate panel

**URL:** <https://community.exalate.com/t/feature-request-better-control-over-which-jira-spaces-show-exalate-panel/8366>\
**Category:** Product Portal\
**Created:** [September 10, 2026, 5:21pm UTC](https://community.exalate.com/t/feature-request-better-control-over-which-jira-spaces-show-exalate-panel/8366 "2026-09-10T17:21:40Z")\
**Posts on this page:** 4\
**Page:** 1

<div class="post-metadata">

**Author:** ![German\_Lesch](https://dub1.discourse-cdn.com/flex018/user_avatar/community.exalate.com/german_lesch/32/340_2.png) [@German\_Lesch](https://community.exalate.com/u/German_Lesch)\
**Post date:** [September 10, 2026, 5:21pm UTC](https://community.exalate.com/t/feature-request-better-control-over-which-jira-spaces-show-exalate-panel/8366/1 "2026-09-10T17:21:40Z")

</div>

As users of Exalate Classic for Jira Cloud, we’d like to request better control over which Jira projects/spaces show the Exalate panel and actions.

Currently, we can only globally turn the panel on and off for non-admins. We’d like to control in which project it is shown. For our use-case it would be enough, if the panel is only shown in projects for which a connection has been established. 99% of our projects do not use Exalate, but those that do, need the panel, so we have to leave it on. This causes curious users to click it and try to connect completely unrelated issues. On-premise this even caused problems, because Exalate does not impede the exalating of issues with connections unrelated to the project!

---

<div class="post-metadata">

**Author:** ![MikeFowler](https://avatars.discourse-cdn.com/v4/letter/m/77aa72/32.png) [@MikeFowler](https://community.exalate.com/u/MikeFowler)\
**Post date:** [September 29, 2026, 11:44am UTC](https://community.exalate.com/t/feature-request-better-control-over-which-jira-spaces-show-exalate-panel/8366/2 "2026-09-29T11:44:51Z")

</div>

We have a similar use case where there are a large number of projects / spaces that do not require the Exalate panel.

Having the ability to hide the panel per project / space would be beneficial.

---

<div class="post-metadata">

**Author:** ![francis](https://dub1.discourse-cdn.com/flex018/user_avatar/community.exalate.com/francis/32/312_2.png) [@francis](https://community.exalate.com/u/francis)\
**Post date:** [October 28, 2026, 8:48am UTC](https://community.exalate.com/t/feature-request-better-control-over-which-jira-spaces-show-exalate-panel/8366/3 "2026-10-28T08:48:20Z")

</div>

Make sense. How would you want to configure it @MikeFowler ?

---

<div class="post-metadata">

**Author:** ![MikeFowler](https://avatars.discourse-cdn.com/v4/letter/m/77aa72/32.png) [@MikeFowler](https://community.exalate.com/u/MikeFowler)\
**Post date:** [October 28, 2026, 9:45am UTC](https://community.exalate.com/t/feature-request-better-control-over-which-jira-spaces-show-exalate-panel/8366/4 "2026-10-28T09:45:28Z")

</div>

@francis ,

I can see it working in two ways.

First, in the way that @German_Lesch talks about - hide the Exalate panel until there is a connection within the project / space. Almost all of our connections are controlled via Triggers so reduces the need for manual syncing of tickets.

This would potentially also need the manual Exalate / Connect capability to be moved from the Exalate Panel to the App layer where an admin can specify Jira Key & Connection for a ticket to be Exalate’d or Connected:

 ![image](https://europe1.discourse-cdn.com/flex018/uploads/exalate1/original/1X/7c86b1b82dc928662cdc9641b034bb36f9079e76.png)

 ![image](https://europe1.discourse-cdn.com/flex018/uploads/exalate1/original/1X/308ac83dfa7a98fff313a1e3e8ec1a6b1b7aecd7.png)

The other option would be to have effectively a list of projects / spaces with a toggle switch to turn the panel on or off for a specific project / space - in a similar way that the “Triggers” screen has.
